BANK STABILIZATION ON THE OTTAWA RIVER
Mandate Assessment of the state of the river banks (320 km of banks studied); testing and selection of a suitable…
Mandate Assessment of the state of the river banks (320 km of banks studied); testing and selection of a suitable…
Mandate Geomorphological analysis of 370 km of shoreline, of which 139 km were eroding. Feasibility study of the protection work;…