Mandate
Assessment of the state of the river banks (320 km of banks studied); testing and selection of a suitable stabilization method for the erosion conditions; development of the stabilization program and planning of work over a six-year period; identification of potential borrow sources; preparation of plans and specifications for the stabilization work; coordination, supervision and technical support during construction; drafting of compliance reports. Report on the evolution of the protection works 20 years after their installation; preparation of a scientific article.

1989 à 1998
2011 à 2013
STUDY PERIOD
55 km
OF RIVER BANK PROTECTED