skip to Main Content

Mandate

Assessment of the state of the river banks (320 km of banks studied); testing and selection of a suitable stabilization method for the erosion conditions; development of the stabilization program and planning of work over a six-year period; identification of potential borrow sources; preparation of plans and specifications for the stabilization work; coordination, supervision and technical support during construction; drafting of compliance reports. Report on the evolution of the protection works 20 years after their installation; preparation of a scientific article.

CLIENT

1989 à 1998

2011 à 2013

STUDY PERIOD

55 km

OF RIVER BANK PROTECTED

READY TO START YOUR PROJECT?

Free Whitepaper

Discover the possibilities and pitfalls of Google Earth® and learn how to detect when to call on experts.

Back To Top