Mandate
Study of the shoreline of all water bodies affected by the project, including the streams with increased flow (5 rivers and lakes) and those with reduced flow (3 rivers). Characterization of the Rupert and La Grande River deltas and detailed reconstruction of the recent history (1953-2002) of the foreshore of Rupert Bay.

2002 à 2005
STUDY PERIOD
3 500 km
SHORELINE STUDIED