Mandate
Photo-interpretation studies conducted in preparation for the connection of a dozen planned wind farms to the grid in the Centre-du-Québec, Beauce, Charlevoix, Bas-Saint-Laurent and Gaspésie regions: line corridor design; pylon site optimization; construction equipment access studies.

2005 à 2014
STUDY PERIOD
350 km
LINES STUDIED